Grounded a $4M jet over a $30 connector I found at 2am in Wichita
Working the overnight shift in Wichita last month, a comm radio kept dropping out during a ramp check and nobody could pin it down for two days. I pulled the whole rack apart at 2am and found one cannon plug with a cracked insulator hiding behind a wire bundle, so I swapped it and the fault cleared on the first power-up. The part cost 30 bucks and the grounded time cost way more, which tells me we spend too much on fancy test boxes and not enough on actually looking at the hardware. My lead still wants a full bench test done before sign-off, but I think visual inspection on every connector should come first. How many of you are catching stuff like this on the bench versus finding it on the tail at night?