I stopped labeling every wire on the bench and got fewer mix-ups
Everyone says label every single run, but last month on a King Air panel job in Wichita I only labeled the connectors and left the mid runs bare with a quick sketch on the bench card. My rework time dropped from about 4 hours to 90 minutes. Turns out the extra tags were hiding the routing mistakes I actually needed to see. Anyone else find that less labeling works better for them?