Hit 47 frozen bottom bracket pulls in one month and I'm changing how I quote labor
Last month I started tracking every seized bottom bracket that came through the shop on a whiteboard by the stand, and I hit 47 by the 30th. I figured it was maybe 15 or 20, so that number stopped me cold. Most of them were on bikes from the big box stores or ones that sat outside near the beach in Santa Cruz, and each one ate up at least 40 minutes of heat, soak, and curse words. I was quoting a flat 30 minute rate for a bottom bracket swap, so I was basically donating an hour on half those jobs. Starting this week I ask two questions up front and charge a separate removal fee if it's rusted solid. How do you all handle seized BBs on your labor quotes without scaring the customer off before they even say yes?