Hot take: dry-firing a water tube because the sight glass lied to me cost 6 hours in Gary
I read the glass as full on a 60,000 lb/hr boiler at the mill in Gary and the low water trip dumped the burner before I ever caught the real level, so I spent 6 hours pulling and rodding the column and water connections on a rig I thought was already clean. Half our crew says pull and rod every column at every annual just to be safe, the other half says if it reads right on a bump test, leave it be and use the time elsewhere. Where do you land on it, open it up on schedule or trust the test?