The time a tube let go on a boiler in Gary and I had to think fast
Back in 2009 I was on a re-tube job in Gary, Indiana, and we were rolling in new tubes when one of the old ones let go right at the sheet. Water started spraying and the guy next to me dropped his roller and jumped back. I grabbed a wooden plug from the bucket, tapped it in with a dead blow, and we got the isolation valve shut before the whole thing flooded the floor. We lost about four hours drying out the insulation and I had to explain to the super why my plug was the only thing that kept the job from turning into a swimming pool. How do you all handle it when a tube lets go on the job?