Went from twist-on connectors to Wago levers on a 12-zone panel in Reno and I'm not going back
Honestly I always thought lever nuts were just hype from the YouTube installers. But I rewired a 12-zone panel in Reno last week and used Wago 221s on every zone leg, and I knocked out the whole thing in about 3 hours instead of the 5 it usually takes me. No twisting, no tape, and I could pop a leg loose to test it without wrecking the splice. What are you all using on panel cleanup these days, or am I late to this one?