My old foreman in Baltimore told me to lay the corners first and it still holds up 12 jobs later
He said if you get your corners plumb and square on day one, the rest of the wall just falls into line, and after fighting a bowed wall for two hours last month I finally got why he was so stubborn about it. Funny how the plain advice from the guy with the dirty trowel beats anything I read online. What's the one tip from an old timer that turned out true for you?
Had a guy named Sal back on a job in Philly who drilled the same thing into me about door frames. He made me check plumb on both sides and the head before I touched the casing, said the trim can hide a lot but it can't hide a crooked opening. Took me three doors popping open on their own before I started doing it every single time, no shortcuts. That man's trowel looked like it lost a fight with a cement mixer and he was still the smartest guy on site.