My electrician buddy said he never bids a job without walking the crawlspace, and a $2,400 change order in Boise proved him right | Commercial Contractor Talk - Opinions Matter
My electrician buddy said he never bids a job without walking the crawlspace, and a $2,400 change order in Boise proved him right
He told me he found a rotted subfloor joist and a live knob-and-tube line on a 1950s building before he ever put a number on paper. I used to bid off the drawings and eat the surprises. Any of you walk the site first no matter how small the job looks?