Update: I flipped on requiring retainage on every job after talking to a GC in Tulsa
I used to hold back 10% on every sub, no exceptions, because my old boss drilled it into me. Last week a GC named Ray in Tulsa walked me through how it was costing him on a 40k drywall package, since his best crew started padding bids to cover the cash flow gap. Hearing it from the other side made me realize I was just shifting my risk onto the price. Curious if other folks hold retainage on small jobs or only the big ones.