26
That one Tuesday where EVERYTHING went sideways on a commercial install
I was doing a DMP panel swap at a 3 story office building downtown and the old wiring was a total rats nest from the 90s. Took me 6 hours just to trace 12 zones because someone used the same colored wire for everything. My helper accidentally snagged a 24V wire and shorted the whole keypad bus, wiped my programming. Has anyone else dealt with a previous installer who just left zero documentation?
1 comments
Log in to join the discussion
Log In1 Comment
dylan_bell4h ago
Ever find a pile of wire nuts behind the drywall?
7