Vent: found out primer sealer needs 30 minutes flash before topcoat, not the 10 I'd been using
Been spraying SPI epoxy for almost two years and always gave it 10, maybe 15 minutes. Buddy hands me the tech sheet at his place in Akron last month and there it is, 30 minute minimum flash at 70 degrees. I argued with him. Then I read the whole sheet. Lesson learned the hard way on a door I had to strip back down. How long are you all letting yours sit before the base goes on?