PSA: a honeycomb blowout on a 4,000 sq ft pour in Wichita cost us 11 hours because of one dumb mistake
A few years back we were pouring a warehouse floor outside Wichita and the first bay came up with honeycomb along the whole cold joint. Nobody caught that the vibrator tip was worn down to almost nothing until the third truck was already down. We spent 11 hours chipping, patching, and re-pouring that bay while the GC stood over us, and the fix cost about $2,300 in material and crew time. Check your vibrator heads and your consolidation pattern before the first truck shows up, not after. Has anyone else had a cold joint go bad like that, and how do you get the crew to actually check the tips?