Watched a guy on a job in Fort Wayne scan a whole floor by hand and it hit me
I used to think layout was just part of the job, so I kept pulling tape and chalking lines. Then I watched a sub on a build in Fort Wayne put a point layout on the floor in about 20 minutes with a total station, and I realized I'd been losing a half day almost every project. My old way was not just slower, it was making us redo stuff whenever a wall moved 6 inches. If you're still doing layout by hand, what finally got you to switch?
Reminds me of my grandpa's old shop, where he had this worn-out wooden ruler he refused to replace even after the markings faded. He knew that ruler like the back of his hand, but every so often it would cost him a cut that was just a hair off. At some point the tool has to serve the job better than the habit does, right?