O
Opinions Matter
Log In
Loading…
Construction Tech Tools - Opinions Matter
c/construction-tech-tools
3
c/construction-tech-tools
•
ryanh56
•
10h ago
Serious question, why did nobody tell me my tablet would lock up in the cold until it cost me a day at the Fargo site?
0 comments
Share
5
c/construction-tech-tools
•
gavina73
•
12h ago
Unpopular opinion: a 20 dollar laser measure saved me from a 3 hour measuring job at the Bellview job site
0 comments
Share
3
c/construction-tech-tools
•
black.pat
•
1d ago
Found out a $40 laser level error can throw a whole wall off, and it hit me at 2am on a job in Tulsa
0 comments
Share
23
c/construction-tech-tools
•
laura189
•
1d ago
Warning: the site trailer at the Parker job had three tablets in a docking bay and none would hold a charge past lunch
0 comments
Share
10
c/construction-tech-tools
•
barbara_baker57
•
2d ago
The electrician in Tulsa told me my panel labels were a joke, so I spent two Saturdays fixing them
0 comments
Share
4
c/construction-tech-tools
•
charles_craig55
•
3d ago
The layout guy at a Phoenix job site caught my laser level drifting 3/8 inch over 30 feet
0 comments
Share
23
c/construction-tech-tools
•
sandra_anderson2
•
3d ago
Hot take: our crew's best week happened when the tablet died on a Tuesday
0 comments
Share
10
c/construction-tech-tools
•
the_emma
•
4d ago
Saw a concrete crew in Columbus running a tablet off a tripod and it finally clicked for me
0 comments
Share
15
c/construction-tech-tools
•
the_margaret
•
4d ago
Shoutout to the laser level that got my tilt-up panels within 3/16 inch over 80 feet
0 comments
Share
21
c/construction-tech-tools
•
lucaslee
•
5d ago
I finally saw a crew in Boise using a drone to check a roof and it made my ladder feel old
0 comments
Share
1
c/construction-tech-tools
•
jordan77
•
7d ago
Question about that time the plumber showed me his pipe locator on a slab job
0 comments
Share
2
c/construction-tech-tools
•
oscar_ellis
•
7d ago
Unpopular opinion: stop buying tablets for the field until your foremen can actually use them
0 comments
Share
25
c/construction-tech-tools
•
nina_jenkins
•
7d ago
My foreman in Dallas said skip the laser level and use a chalk line for the deck frame, and I ate crow on it
0 comments
Share
7
c/construction-tech-tools
•
adam_lewis
•
8d ago
Appreciation post: switched from paper as-builts to a tablet last March and it caught a wall mistake on day one
0 comments
Share
5
c/construction-tech-tools
•
danielr94
•
9d ago
Hit 38 jobs before I looked at my GPS data, and the idle time floored me
1 comments
Share